NIKET EOOD acquired the maintenance and the management of a small hydro power plant of 1500kW.
Carried out the construction and the complete rehabilitation of the automation, the installation of a condenser system, a remote access system, the installation of a video surveillance, the rehabilitation of turbine and hydraulic system.
Preparation of an overall plan for maintenance, management and reconstruction of the power plant.